Network statement

Declaración de red

Line Status

Estado de línea

Catalog TP Ferro

 

   Trans-European Transport Network logo

RFF-TP Ferro-ADIF Transition

The transition of trains in the interface areas between TP Ferro and ADIF and between TP Ferro an RFF will take place dynamically without stopping the trains.

The transmition is transparent for the driver, allowing him to concentrate totally on driving and the transition of the equipment (1500 / 25.000 kVB  /ERTMS).

The TP Ferro control post is coordinated with the ADIF and RFF control posts for transitions.